Job sheetWhat we found
The customer in Basildon SS15 had a section of roof where the old felt and timber battens had failed: a five metre run of it. Failed felt stops doing its job quietly. It goes brittle, tears between the battens and lets wind-driven rain reach the timbers. The battens then soften, the tiles above them lose their grip, and the damage spreads along the roof.
Stripping out
We put scaffold up against the gable so the team could work safely along the whole run. The tiles over the failed section came off by hand and were stacked for reuse, and the old felt and rotten battens were stripped out back to sound timber either side.
New membrane and battens
New breathable roofing membrane went on first, lapped into the existing felt at each end so water runs over the joint, not into it. New treated timber battens were fixed at the right gauge for the tiles, then the same tiles were laid back on and the ridges repointed.
Finished and handed over
The rest of the roof was sound, so the customer did not need a new roof and was not sold one. The repair took one day and was completed on 31 October 2026. It carries our 10-year guarantee on repairs. This is the job we point to when people ask whether we push new roofs: a repair was the right answer, so a repair is what was done.
More: Roof repairs · Roofer in Basildon · All our work