Our SS15 repair and SS14 full re-roof
In Basildon SS15, we stripped five metres of failed felt and timber battens. We fitted breathable roofing membrane and treated timber battens, relaid the same tiles and repointed the ridges. The repair took one day and renewed the damaged section without stripping the whole roof.
The SS14 house needed a full re-roof. Failed felt was letting water in, and the timbers were very weak. We stripped right back to the rafters, fitted new membrane and treated battens, and relaid the same tiles. That took three days. Both Basildon jobs were completed on 31 October 2026.
Opening enough roof to reach sound material
A patch needs a sound edge to join onto. We follow torn felt and weak battens beyond the first visible leak before setting the repair boundary. That gives the new membrane a proper overlap and the tiles firm support, instead of leaving another failing section just beside the repair.
Where we work in and around Basildon
- Basildon town centre
- Laindon
- Langdon Hills
- Pitsea
- Vange
- Fryerns
- Lee Chapel North
- Lee Chapel South